The Raise Total
$5,000,000Price Per Token
$8.00Raise Start
November 22, 2021Minimum Investment
$5,000,000https://www.brighsun.com/index.html
Number Investors | 10 |
Raise Close Date | June 30, 2022 |
Last Updated | March 21, 2022 |
Current Amount Raised | $2,000,000USD |
Total Raise | $5,000,000 USD |
Soft Cap | $0 USD |
Raise Status | Open since Active |
Minimum Investment | $5,000,000 USD |
Accepted Investors | Tba |
Security Type | Equity |
Exemptions | NA |
Instrument | Equity |
Price Per (2UT) | $8.00 |
Token Issuance Platform | CryptoSX |
Token Protocol | ERC-20 |
Token Issuance Info | Private placement and pre-STO sales commenced with 2 months from STO approval. |
Payment Options |
|
Token Rights
Tokenised Shares
Brighsun's advanced Li-S chemistry, offering high energy density and low raw material costs, will be a game changer in the EV industry. After 8 years of research, the Brighsun team developed lithium-sulfur (Li-S) batteries with an energy density 5-8 times higher than conventional secondary batteries.
According to results from an internationally accredited testing agency (SGS), Brighsun's new technology allows an Li-S battery to keep 91% of its initial capacity after 1,700 cycles at a rate of 2C (being fully charged/discharged in 30 mins).
Li-S batteries have the potential to become the most promising energy storage systems for future railways, ships and airlines. Industries such as electric supply grid storage, mobile phones, drones and AI will also benefit from dramatically higher energy density storage provided by Brighsun's new battery system.
In late January 2021 and after more than a year of intense effort spent in development, pilot studies, trial production, designing, and industrialisation process, we report that 2U's battery team has achieved significant progress. That means 2U lithium batteries, by energy density, could soon power Electric Vehicles(EV) to travel more than 2,000 km on a single charge!
Brighsun 2U Li-s battery research team has expanded and needs to continue to do so, much effort to develop the production process, from slurry mixing, coating to the injection of the electrolytes. The team has been collecting a significant amount of data from the pilot production, optimising conditions for each production step. The production process will contribute a substantial value to large scale production at a later stage.